Skip to content

COMPETENCE & APPOINTMENTS

Principal Designer competence: evidence guide and checklist

A practical CDM competence review for clients and architects: relevant experience, organisational capability, evidence gaps and a free printable checklist.

Original CDMlogic guide · updated · Great Britain CDM / England or Wales Building Regulations where stated

How can a client check Principal Designer competence?

Start with the particular role and project. Ask for relevant experience, examples of coordination and evidence that the proposed person or organisation has the capacity to do the work. Review the evidence, resolve gaps and record why the appointment is suitable. A platform can organise that review; it cannot establish competence on its own.

This guide is for architectural practices preparing evidence and clients considering a CDM Principal Designer appointment. The questions below are an original practical review routine, not a statutory assessment scheme.

Free competence review checklist

A four-page printable tool covering project scope, evidence questions, outstanding actions and a reasoned appointment review. Use it independently of CDMlogic; no email address is required.

Download the checklist (PDF, 4 pages) →

Version 1.0 · 29 October 2026 · The guide below explains the review process in HTML.

1. Define the role before collecting certificates

Identify the client, location, proposed work, project complexity and foreseeable design risks. Record who is being considered, what they will control and how long the role is needed. A small extension and a complex occupied refurbishment may need very different evidence.

For CDM 2015 in Great Britain, HSE describes the Principal Designer as a designer with control over the pre-construction phase. Their relevant skills, knowledge and experience, and organisational capability where applicable, should match the project’s complexity and risks. Read HSE’s Principal Designer competence guidance.

2. Ask for evidence that explains the work

Use these prompts to discuss the proposed appointment. A document being present is a starting point for review, rather than evidence that every question has been answered.

Relevant project experience
Which comparable projects did the proposed lead work on, what was their actual role and what did they coordinate? Ask how that experience relates to the scope and risks of this project.
Design risk decisions
Can they explain an example of eliminating or reducing a foreseeable risk through design, including the options considered and the significant residual information communicated?
Information and coordination
How will they identify PCI gaps, obtain input from other designers, liaise with the Principal Contractor and keep changing information under review?
People, time and organisational capability
Who will lead the work, what time is available and how will absences or specialist interfaces be managed? Ask for relevant procedures and examples showing how those arrangements operate.
Current knowledge and development
What relevant learning, CPD or professional experience supports the proposed work? Discuss how it has been applied. A course certificate or membership alone does not explain suitability for the project.
Limits and escalation
Which aspects need additional expertise, who will provide it and how will the Principal Designer coordinate that input? Identify unresolved limitations before deciding on the appointment.

Keep enquiries proportionate. HSE’s CDM guidance L153, paragraphs 58–65 and 94–100 explains reasonable checks and organisational capability. Avoid collecting duplicated paperwork that adds little to the actual review.

3. Keep a reasoned review record

  1. Reference the evidence: identify its source, date or revision, relevance and limitations. Obtain permission before sharing confidential examples.
  2. Record the reviewer: name the person considering it, the date and any further expertise needed to assess it.
  3. Track gaps: state the question, why it matters, the action owner and when an answer is required.
  4. Explain the decision: record why the evidence supports the proposed appointment, or why further information or another arrangement is needed. A score alone is not the reasoning.
  5. Revisit changes: agree review triggers such as a different project scope, lead person, resources or newly identified risks.

Link the conclusion to the appointment scope and issue record. A record of review is distinct from the appointment itself.

A fictional example: experience that needs exploring

A client is considering a small architectural practice for the CDM Principal Designer role on an occupied-house refurbishment. The practice provides a CV and CPD record. These do not yet explain who will coordinate structural design changes or manage information gaps while the occupants remain in the building.

The reviewer asks for a relevant coordination example, the proposed lead’s availability and a description of the specialist interfaces. The record stays further information required until the answers have been considered. The client then records a reasoned appointment decision and any outstanding arrangements. This example illustrates the review process; it does not determine what is sufficient on a real project.

For related project records, follow the worked refurbishment project or domestic project guide for architects.

CDM and Building Regulations competence are separate

The CDM role coordinates health and safety. The Building Regulations Principal Designer role in England and Wales concerns design compliance with applicable building requirements. Evidence relevant to one role does not automatically demonstrate competence for the other.

Wales introduced Part 2B dutyholder and competence provisions from 1 July 2026, subject to applicable transitional arrangements. Welsh guidance addresses skills, knowledge, experience and behaviours for individuals, alongside organisational capability, and additional expectations for the Principal Designer role. Check the applicable regime before using a review framework.

If one organisation is proposed for both roles, review each scope and competence requirement separately and make the appointments clear. See the Welsh Government duties and competence guidance, Welsh transitional arrangements and England’s Building Regulations guidance. Our Wales guide explains the context.

What can Principal Designer competence software help with?

Look for a way to connect project scope, evidence references, reviewer comments, unresolved actions and the appointment decision. Clear ownership and review dates make it easier to follow what has actually been considered. Consider access controls and how your team will retrieve the record later.

CDMlogic’s current pilot supports CDM dutyholder and appointment records, linked project evidence, actions, PCI and design risk records. The checklist is a separate practice tool. The pilot does not provide an automated competence assessment, a competence register or a complete Building Regulations assessment workflow. Explore the Principal Designer software page and current product scope.

Common questions about competence evidence

Can software verify that a Principal Designer is competent?

Software can help organise evidence and decisions. A meaningful review still needs someone able to consider the evidence against the actual role, project and risks. An upload, completed checklist or green status does not establish competence.

Does this checklist certify competence or provide training?

No. It provides prompts for an evidence review. It is not accredited training, an examination, a certification scheme or a substitute for relevant professional judgement.

Should competence be reviewed only at appointment?

Keep the arrangements under review as the project develops. If the scope or team changes, consider whether the original evidence and resources still match the work and record any action needed.

Continue your project review

General workflow information, not a project-specific determination. Check current official guidance and obtain appropriate professional advice for your project.

← All resources