Original CDMlogic guide · updated · Great Britain CDM / England or Wales Building Regulations where stated
This guide covers a practical starting review for extensions and refurbishments. Building Regulations duties must be considered separately for the project’s jurisdiction. It is not an appointment document or a project-specific assessment.
Is this actually a domestic client?
Under CDM, a domestic client commissions work on their own or a family member’s home outside a business activity. A residential building alone does not establish domestic-client status; check why the work is being commissioned.
Who carries the CDM client duties?
They normally pass to the contractor on a single-contractor project, or the Principal Contractor where more than one contractor is involved. A Principal Designer can instead agree in writing with the domestic client to undertake the client duties. An architectural appointment alone does not establish that separate agreement.
Record the basis for the arrangement. See HSE’s domestic-client guidance.
More than one contractor does not mean working simultaneously
Consider the foreseeable contractor arrangement across the project, including subcontractors. CDM principal appointments are relevant where more than one contractor is involved or reasonably foreseeable. If a domestic client does not appoint a Principal Designer, that role falls to the designer controlling the pre-construction phase. Do not assume an absent letter removes the role.
Check HSE’s L153 guidance, including regulations 5 and 7, and record the actual scope and procurement assumptions.
A first review you can run with the homeowner
The prompts below are an original practice aid. Agree who will investigate each question; they are not instructions for a homeowner to carry out surveys or intrusive work.
- Brief and existing use
- What is changing? Will anyone occupy the home during the works? What is known about shared access, neighbours or other affected people? Record assumptions that need confirmation.
- Procurement and appointments
- Who is likely to design and carry out each part? Are specialist trades or client-appointed contractors anticipated? Record roles, scope, competence considerations and any unanswered appointment questions.
- Existing information
- What drawings, previous alteration records, surveys and service information exist? Identify limitations. Ask appropriate specialists which further information is needed for the proposed work.
- Design decisions
- Which decisions could change foreseeable risks? Record the options assessed and why the chosen approach is appropriate, rather than repeating generic hazards.
- Communication
- Who needs the decision and significant residual information? Record the relevant drawing or document issue, recipient and outstanding response.
- Future work
- What information will matter for later maintenance or alteration? Identify handover needs while the design is developing.
Proportionate information, with visible gaps
A small extension may need a concise record. Its usefulness depends on the actual work, not the number of pages. A measured drawing may establish dimensions without establishing structural condition. An old service drawing may be a starting point without confirming the present route. Label what is known, the evidence supporting it and what remains unresolved.
Use the PCI checklist and information-gap guide to allocate owners and review points. Survey scope and investigation methods require appropriate project-specific judgement.
What the architect should record about design review
Designers must address foreseeable health and safety risks through design and share relevant information. See HSE’s designer responsibilities.
For an opening in an existing wall, a useful practice record asks which assumptions need assessment, what alternative layouts were considered, which actual design information supports the decision and what the next recipient needs. It does not prescribe a beam, a propping arrangement or a construction sequence. See the worked design risk record.
Before construction and when the design changes
The Principal Contractor plans and manages the construction phase, including the construction phase plan. For a single-contractor project, the contractor prepares the plan. An architect’s design risk record is not a substitute. Read HSE’s Principal Contractor guidance and contractor guidance.
Agree a practical channel for findings and design queries. When an opening-up report or client change challenges an assumption, identify the affected design, responsible reviewer and communication needed. Keep earlier issues traceable and make the current position clear.
CDM and Building Regulations: make two separate checks
England and Wales have their own Building Regulations dutyholder arrangements. Do not treat a CDM Principal Designer appointment as automatically appointing the Building Regulations role, or assume the domestic-client provisions are identical across regimes.
- England: check the official Building Regulations dutyholder guidance for the applicable client and appointment arrangements.
- Wales: check the Welsh dutyholder guidance and the project’s transitional position. Our Wales changes guide explains the starting questions.
- Scotland: use the applicable Scottish building standards arrangements; do not import England’s or Wales’s framework.
A short review before the next issue
- Are the client type, jurisdiction and contractor assumptions recorded?
- Are roles and any agreement to undertake domestic client duties explicit?
- Does each important information gap have an owner and review point?
- Can the team identify the design decision, evidence and significant information communicated?
- Are changes and outstanding handover items visible?
Walk through these questions in the fictional refurbishment project example. CDMlogic can help organise records and evidence; its pilot workflow does not determine competence, legal compliance or building control approval. Read our current regulatory scope.
Ask about exploring the pilot with your practice.
Continue your project review
- Health & Safety File contents and handover guide
- Worked design risk register example
- CDM software for architects
- CDM Principal Designer software
- Pre-construction information checklist
- Design risk assessment and register guide
- CDM and Building Regulations Principal Designer roles
- CDM workflow for architectural practices
General workflow information, not a project-specific determination. Check current official guidance and obtain appropriate professional advice for your project.
← All resources